QUALITY MANAGEMENT II
Quiz-summary
0 of 20 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
Information
Quality Management II
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Average score |
|
Your score |
|
Categories
- Not categorized 0%
- Quality Management 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- Answered
- Review
-
Question 1 of 20
1. Question
- Quality assurance comprises activities done in a specific project to ensure that requirements are being met and activities that contribute to the continuous improvement of current and future projects.
-
Never Always
-
Question 2 of 20
2. Question
2. Reviews intend to understand what happened, to learn lessons that can be applied to other projects, and to avoid repeating mistakes.
-
Disagree Agree
-
-
Question 3 of 20
3. Question
3. ________ es el proceso continuo de seguimiento y evaluación del trabajo y la adopción de medidas correctivas para que se logren los productos de calidad planificados. El proceso verifica que las actividades ________ se estén realizando mediante planes de calidad aprobados y que se cumplan los requisitos y estándares del proyecto.
-
Question 4 of 20
4. Question
4. The quality control process includes inspections to verify that deliverables are meeting the specifications, as well as acceptance tests before transfer deliverables to the customer.
-
Disagree Agree
-
-
Question 5 of 20
5. Question
5. Adeviation is a temporary department from the specifications; a modification is any change to a design manufacturing process specification that is considered permanent.
-
Disagree Agree
-
-
Question 6 of 20
6. Question
6. When product quality requirements follow industries standards, the main criterion for choosing a supplier is the price.
-
Disagree Agree
-
-
Question 7 of 20
7. Question
7. Configuration management represents policies and procedures for monitoring and tracking design information and changes, and ensuring that everyone involved with the project and, later on, the operation of the end-item has the most current information possible.
-
Disagree Agree
-
-
Question 8 of 20
8. Question
8. Policies and procedures that constitute the configuration management system should be included as a section in the quality plan.
-
Disagree Agree
-
-
Question 9 of 20
9. Question
9. Two aspects of configuration management are identification and control.
-
Disagree Agree
-
-
Question 10 of 20
10. Question
10. Configuration identification is an inherited part of system design that involves defining the structure of the system, its subsystems, and components.
-
Question 11 of 20
11. Question
11. Configuration Item (CI) is any subsystem, component, or part that is to be tracked and controlled as an individual entity throughout the life cycle of the system.
-
Disagree Agree
-
-
Question 12 of 20
12. Question
12. Where multiple units are produced and modifications and improvements are introduced over time, the specific configuration for each individually produced unit must be known, which requires that each specific CI in the product must be traceable to its specification.
-
Disagree Agree
-
-
Question 13 of 20
13. Question
13. Traceability is necessary, so that, for example, the correct spare part, training, and operating manuals can be supplied, and problems can be traced in the event of accidents, customer complaints, or claims regarding product liability.
-
Disagree Agree
-
-
Question 14 of 20
14. Question
14. Design reviews provide confirmation of the data usage during the design process, user’s requirements, and inherited assumptions have been correctly identified.
-
Disagree Agree
-
-
Question 15 of 20
15. Question
15. The reviews should involve subject matter experts from all disciplines and users who are or will be connected to the end-item throughout its lifecycle.
-
Disagree Agree
-
-
Question 16 of 20
16. Question
16. In addition to the formal review, the project manager should encourage many informal reviews.
-
Disagree Agree
-
-
Question 17 of 20
17. Question
17. The design review process also provides networking experience, innovative ideas provided by others, knowledge gained, and , reduction of risk.
-
Disagree Agree
-
-
Question 18 of 20
18. Question
18. Audits focus strictly on verifying that the work is being performed as required by verifying that the management processes comply with prescribed processes, procedures, and specifications, and to determinate the status of the project.
-
Disagree Agree
-
-
Question 19 of 20
19. Question
19. Audits are also performed to verify that technical processes follow prescribed procedures.
-
Disagree Agree
-
-
Question 20 of 20
20. Question
20. Risk priority number (RPN) = Severity (SEV) x Probability (Pro) x Detectability (Det.)
-
Disagree Agree
-